Peristaltic Pump Installation and Piping
Peristaltic Pump Installation and Piping 1. Stable Installation: The pump should be installed on a stable surface to reduce vibration and noise. 2. Flexible Connection: A flexible or rigid short section (approximately 80-100 cm) should be installed between the pump's outlet flange and the pipeline to facilitate tube replacement. 3. Installation Height: The pump can...
0 التعليقات 0 المشاركات 10 مشاهدة 0 معاينة
إعلان مُمول